Cost
Labor savings up to 50%
Lower Transaction costs
Less material handling costs
Administrative costs; Less data entry
Less material to unload
Less material to stock/store
Less material to load
Installation time is 3 to 4 hours
Only install one cabinet, ground sleeve and ground rod (as opposed to cabinet, ground sleeve, ground rod, transformer, ground pad, ground rod, ground lugs, ground wire, extra elbows, extra duct and cable, etc)
Trenching
Dramatically reduces installation space requirements
May reduce ROW or easement costs